assistant architect
AREP, Studio 4 | Paris
July 2022 - September 2022
Underground connection Gare de l’Est - Gare du Nord
Design development and building permit documents for the construction of a pedestrian underground connexion between Gare de l’Est and Gare du Nord in Paris (surveys, plans, sections, elevations).
ASSISTANT ARCHITECT
AIA Life Designers | Paris
June 2021 - September 2021
Centre Pompidou master plan refurbishment, concept design phase 
Plans, sections, elevations, 3D model of the existing HVAC system and floor layout based on on site survey
PROJECT MANAGER ASSISTANT
CARTA Associés | Marseille
July 2020 - September 2020
Renault Michelet construction site 
Supervision on a 300 apartments, 11 600m² of office, a car dealership showroom and workshop construction site: structural works and finishes control sheets focusing on accessibility for disable persons, provisional and final acceptance
work supervisor assistant
Eiffage Construction Sud-Est | Aix-en-Provence
July 2019 - August 2019
Groupama Méditerranée headquarters refurbishment construction site
Structural works and finishes control, provisional acceptance